The full bathroom directly after demolition.
This is the point where the owner is wondering, "How in the world are you going to turn this into what I want?"
Plumbing for a stand up shower stall.
After the reconstruction begins to come together the owner is able to get a better vision of their new room.
Plumbing the toilet while the home owner watches.
Everything must be set up correctly in order for thing to run correctly.
Shower installed.
I ended up going back and replacing the shower because of a manufacturer's defect in the bottom of the shower tub.
The owner was pleased to know that I wouldn't stop until he approved.
That's the part of my career I enjoy the most....a pleased look on the owner's face with the job is completed.
Toilet installed in correct location.
Notice the beautiful flooring the home owner chose for their full bathroom. It is versatile and the laminate looks like real tile.
Good choice.
Completion photos will be added soon.
No comments:
Post a Comment